2005년 - 2010년
Project Name
2010년
Utorogu DOMGAS Pipeline PJT
Manabi CEP PJT – SWS/ARU Basic Design
Flare Load Analysis / Col. Dynamic Simulation
CO/CO2 PSA Modeling
High Purity Hydrogen Regovery Plant (SynGas / PSA / Reformer)
Catechol Recovery System Batch Simulation
2009년
NCC Revamping Safety Investigation PJTCO2 Submarine Storaging Facility Process Design
LLNG Terminal OTS Project
Z PJT Basic Engineering Package
Compressor Dynamic Simulation PJT
2008년
Dynamic Depressurization Verification PJT FEED Verification PJT
VDU Pinch Analysis / Optimization
Facility Improvement for Atm Vent Equipment
FEED Package Verification (EWI)
2007년
Flare System Study of No.2 Aromatic PlantFEED Package Verification (BS-160)
Batch Scheduling Analysis PJT
2006년
Basic Engineering Package (Pilot LA/PLA)SBR Plant Flare System Analysis PJT
2005년
CNC (FCC) Pilot Plant Engineering ProjectCustomer
Honeywell (SPDC)
SK E&C (Ecuador)
GS Caltex (GS Caltex)
Kumho Mitsui (KM Chem)
GS Platech (ONSYS)
KRICT (KRICT)
KODRI
Honeywell (KOGAS)
Lotte Chemical
Daewoo E&C(NAOC)
HHI (KOC)
GS Caltex (GS Caltex)
GS Caltex (GS Caltex)
HHI (KOC)
SK E&C (KOC)
Celltrion (Celltrion)
LG Chem
Year
2010
2010
2010
2010
2010
2010
2009
2009
2009
2009
2008
2008
2008
2008
2007
2007
2006